Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording time]
75 minutes
[Screen size]
Standard
[Contents list]
Opening of Kyushu Shinkansen / Start of S2 and R1 transport / R1 test operation and Kenkai / Establishment of Kumamoto General Rolling Stock Office / New era
[Quantity]
1 sheet
[Video comments]
Introducing the railway in Kyushu, which entered a new era with the opening of the Kyushu Shinkansen. It contains the final operation of the overnight limited express and limited express on the eve of the timetable revision, as well as images of the ground transportation of the S2 and R1 trains, the start of test operation and Kenkai, the running of the Kyushu Shinkansen and the limited express after the entire line was opened.