Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording Time]
196 minutes
[Screen Size]
Wide
[Audio Information]
(PCM)
[Image Special Contents]
103 Series 1500 E12 Train Format / JR Chikuhi Line & 103 Train Series Running on the Day of Ari
[Number]
1
[Image Comments]
Valuable comparison images of JR Chikuhi Line trains, which connect Fukuoka and Saga prefectures and are operated separately between electrified and non-electrified sections. The electrified section is operated between Nishi-Karatsu and Chikuzen-Maebaru in the color composition of Japan National Railways, and the non-electrified section is operated between Karatsu and Imari one way.
[Country Name of Manufacture]
Date