Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording time]
90 minutes
[Screen size]
Wide
[Contents list]
Outline, Opening of Nagano / Extension work, Disappeared Train / Introduction of Series E7 / Drainage, Land Transport, Trial Run and Test Drive / New Third Sector Railway / Opening of Kanazawa and Introduction of Railway Lines
[Number of tickets]
1
[Video Comments]
This is a video material containing the railway situation in Hokuriku, which was renewed by the timetable revision in March 2015. This paper introduces the whole aspect of the opening of the Hokuriku Shinkansen from Nagano to Kanazawa, and the movement of the old parallel conventional lines separated from JR.